#KLWNBUG

2025-10-19

Thanks for more great #cycling, #KLWNBUG and hope you all got home before the main rain started! The ride through falling leaves to the arboretum is next Saturday, 0915 at the cut bridge #kingsLynn. 75km train-or-car-assist and 50km car-assist available if you ask.

People cycling along a road between trees with leaves falling, including e-bikes and a hand-cycle
2025-09-08

Much Ado About Nothing - Thu 11 September, Stow Hall, Norfolk, England - The HandleBards – handlebards.com/show/much-ado-
#norfolkuk #StowBardolph #Handlebards #KLWNBUG

2025-03-14

I updated several Discussion threads for King's Lynn and West Norfolk Bike Users Group on #Cyclescape following yesterday's meeting but there's still more to do when I have time. Any help welcome.

klwnbug.cyclescape.org/threads

#KLWNBUG #space4cycling #PlanningApplication #WestNorfolk

2025-03-06

#KLWNBUG #PlanningApplication #2400608O outline for 5 flats in South Lynn approved because apparently making everyone do 3 sides of a rectangle, incl 2 on roads without pavements, to access shops is acceptable if it's a small distance and National Planning Policy Framework paragraph 117 "give priority first to pedestrian and cycle movements, both within the scheme and with neighbouring areas; and [...] minimise the scope for conflicts between pedestrians, cyclists and vehicles" can get stuffed!

2025-02-07

#2400622FM was amended after #KLWNBUG comments to have good #cycleparking and then approved, but now it looks like it won't be built soon: Former GP surgery can become community hub and food bank
edp24.co.uk/news/24912547.form

2025-01-28

28 Jan Pedal and Chat Called Off | #KLWNBUG - The Norfolk & Fens Cycling Campaign – klwnbug.co.uk/2025/01/28/28-ja

2025-01-25

@ascentale @pete A6. Earliest photo on this device is from a protest trying to keep part of #NCN1 in #kingsLynn closed to private motorists (the bollards are now disused but numberplate cameras are installed instead, so win! For now...). Most recent is riding home through #theWalks in winter sunshine, just before I unexpectedly met a friend from #KLWNBUG coming the other way after his longest ride in years, to the next town south and back.
#bikenite

People with bikes standing around on the entrance to a bus/cycleway, August 2020A cycleway along the embankment of the old town wall, viewed over handlebars and basket
2025-01-11

@ascentale @uxmark @meganL @bikeottawa @DavidTrueman A2. I'm here from #KLWNBUG in the fens, England. 👋

#bikenite

2025-01-09

#WestNorfolk #PlanningApplication #2402270F #Hardwick #Aldi replaces the planned #Lidl and it's OK but still not up to current #cycleparking standards: no priority entrance and further from the door than some regular car parking. I'll ask #KLWNBUG to remind them.

partial plan of a car park, showing the cycleway entering from the top left, to the left of a road, but then with no zebras or nothing to reach the cycle parking across the car park on the bottom-right of the building.
2025-01-09

#WestNorfolk #PlanningApplication #2401969FM #NorthLynn almost there! The #Norfolk Parking Standards require the #cycleparking racks to be nearer the door than regular car spaces, not dumped on the far side by a substation, and for foot/cycle access to have priority over cars. I'll ask #KLWNBUG to remind them.

Plan showing a car park accessed from the road, with cycle racks in the bottom left corner, far from the door roughly centre-right.
2024-11-14

#WestNorfolk #PlanningApplication #2401497F #kingsLynn Two more flats, #cycleparking for 4 or 6 bikes, but it's up a flight of external stairs. Is that good enough, #KLWNBUG ?

annotated except of the plan showing the bike store... on the first floor
2024-11-14

#WestNorfolk #PlanningApplication #2401914F #Emneth service station with much bigger shop yet still no #cycleParking (or access from #space4cycling but there are other properties in the way). I'll suggest #KLWNBUG requests parking.

Partial plan of the service station, showing the sales building more than doubling.
2024-11-14

#Norfolk #PlanningApplication #FUL20240045 #kingsLynn #Library - It has some #cycleParking (more than the old library which has none) but is it enough? Is it as much as #KLWNBUG hoped?

2024-10-10

#2100152RMM #WestNorfolk #planningApplication #conditionDischarge for the major estate at #DenverHill - really don't think this cycleway to London Road should be split if so narrow and if it is, that tactile paving should be flat-top not corduroy and between straights 1.2m each side to avoid being a skid hazard. #KLWNBUG
Screenshot (2024-10-10 10:21:08 AM)

2024-10-10

#WestNorfolk #planningApplication #2401488F is another industrial unit in #kingslynn with a plan of rectangles and no #cycleparking

#KLWNBUG

2024-10-10

#2401550RMM #WestNorfolk #planningApplication #Gayton estate with "footpath" link and cobbles across the entrance road. Either upgrade to cycleway or remove the setts. #KLWNBUG
Screenshot (2024-10-10 10:05:52 AM)

Plan of an estate with an inverted T shape
2024-10-10

#2401582F #WestNorfolk #planningApplication #Saddlebow new industrial building with no #cycleparking - no plan this time because it is basically rectangles and we're interested in something not there. #KLWNBUG

Client Info

Server: https://mastodon.social
Version: 2025.07
Repository: https://github.com/cyevgeniy/lmst