#connectors

2025-11-27

Didn't knew this about HDMI?
Doesn't go against #eu intention to use #standard #connectors for all the devices?.

#displayport is a much better option.

The EU should #ban #HDMI on new devices.

youtube.com/shorts/ga8WOONU12k

2025-10-17
Text Shot: Claude works with:

Microsoft SharePoint and OneDrive: Search and analyze documents across sites and libraries, from project specifications to strategic plans, without manually uploading files to Claude.
Microsoft Outlook: Access email threads, analyze communications patterns, and extract insights from your correspondences to understand project status, client feedback, or team alignment.
Microsoft Teams: Search through chat conversations, channel discussions, and meeting summaries to surface decisions, track project updates, and understand what your team has been discussing.
2025-10-17

It would definitely make it easier to create smaller versions of the SoundSlab grid too. I like this beast, but being modular has advantages!

I can manufacture the individual boards cheaper, or even stuff them at home since the boards would fit in my “reflow oven” *cough* toaster oven.

Also, perhaps someone might want a 4x4 grid for some other fun project.

#electronics #connectors #pcbdesign

SoundSlab 18x8 grid of 128x128 pixel LCDs all mounted on individual mechanical keys, all to show DOOM!
2025-10-17

This lunchtime's crazy idea: what if I split the SoundSlab grid into smaller 4x4 pieces + two 1x8 columns for control on the sides?

Fitting FFC connectors seemed impossible, but guess what? Vertical FFC connectors exist! A 40 pin vertical FFC connector would fit right between keys on the back.

The boards would have to be mounted flush next to each other, and there's not really room for board-to-board connectors.

#electronics #connectors #pcbdesign

Bottom of the SoundSlab grid showing all the 12-pin 0.5 mm pitch FFCs connecting to the LCDs on each mechanical keySurface mount vertical oriented FFC connector with 40 pins at 0.5 mm pitch
2025-10-02

What connectors do people like to use for 12V internal power bussing on their projects? (25-50W ish)

I've been using these PCIe 12V connectors, but they’re kind of chunky. They're super convenient though since I had a pile of cables in the closet, and buying ready-made cables is cheap.

There are tons of nice power connector families out there, but often you have to make the cables…

#electronics #connectors #cables

Close up of PCIe power connectors and cable connected to two SoundSlab boards
2025-09-30

Did you know that #ONLYOFFICE Docs can be integrated into any web-based business platform via ready-to-use connectors?

From Alfresco, Confluence, Jira, Nextcloud, Redmine, Liferay, ownCloud, to various CMS, LMS & more!

By embedding document editing where your team already works, you streamline collaboration without forcing users to leave their favorite tools.

Explore all the available connectors: onlyoffice.com/all-connectors.

#ONLYOFFICE #Integration #OpenSource #Collaboration #Connectors

eicker.news ᳇ tech newstechnews@eicker.news
2025-08-13

#OpenAI is rolling out support for #Gmail, #GoogleCalendar, and #GoogleContacts #Connectors in #ChatGPT (Pro). This allows ChatGPT to reference information from these services in conversations, making it faster and easier to bring information into chats. bleepingcomputer.com/news/arti #tech #media #news

Kevin Karhan :verified:kkarhan@infosec.space
2025-08-04

@Techmeme At least it's not totally absurd for a corporation known for #connectors in #computers and #tech to extend to cover #RF & #HF #connector manufacturers.

2025-07-18

New video on my YouTube channel!

Powe Automate - Connectors - Github
#powerautomate #logicapps #flow #flowfam #github #connectors

youtube.com/watch?v=oXymNX7MKIw

N-gated Hacker Newsngate
2025-07-04

NVIDIA's latest is a masterclass in how NOT to do things: sell products to bots, melt , and deliver -baked . 🚀🔥 Oh, and don't forget the media arm-twisting—because who needs transparency when you have RTX, am I right? 🤡💸
blog.sebin-nyshkim.net/posts/n

2025-07-03

Oh, seems like 1.75mm PLA filament fits nicely into DIN female plugs as a keying pin… Like, when you have to order 8 pins ones because none are available with 7 pins like you need…

#electronics #connectors #DIY

eicker.news ᳇ tech newstechnews@eicker.news
2025-06-04

#ChatGPT gets #connectors for Dropbox, Box, SharePoint, OneDrive, Google Drive, meeting recording and transcription, deep research connectors for HubSpot, Linear, more. techcrunch.com/2025/06/04/chat #tech #media #news

2025-05-27

I'd like to nominate DB13W3 for Most Cursed Connector. I mean, just look at that thing!

Bonus: there were at least two different, incompatible, pinout "standards" for this thing, so there was no guarantee that a random monitor with this cable would connect to your workstation, even if it had the right port.

#note #computers #cables #connectors #cursed #technology

Via: 🔗 danq.me/2025/05/27/db13w3/

Cable with 'male' DB13W3 connector, featuring a D-sub body containing three analogue RGB connectors but with a gap between the second and third into which 10 regular D-sub style pins have been sandwiched in two rows of five).

Client Info

Server: https://mastodon.social
Version: 2025.07
Repository: https://github.com/cyevgeniy/lmst