#ExpressBus

Kevin Karhan :verified:kkarhan@infosec.space
2025-05-20

@davidho WHY is there not like an #ExpressBus / #AirportShuttle Line and/or #train / #tram?

Like I'm shure there are a lot of folks needing to do that round more often than not...

Like even a #minibus #shuttle line would be profitable!

Transit Diagrams 🚋transitdiagrams@mapstodon.space
2025-03-14

Update of my complete official #transitdiagram for the #Verkehrsverbund in #Kärnten #Carinthia #Koroška.

This #map includes all fare integrated #expressbus, #regionalbus and #rail services. It also highlights communities with on-demand transit systems.

PDF: kaerntner-linien.at/wp-content

Transit network map of fare integrated routes in Kärnten
Saarland Öffi-Updatessaar@bahn.social
2025-02-06

Zwischen 16:00 und voraussichtlich 19:30 fahren einige Buslinien (bspw. R6/X6, 504, 506) aufgrund von Friedrich #Merz nicht mehr den Rendezvous-Platz in St. Ingbert an. Stattdessen wird am Bahnhof gehalten.

Ob das auch für die Linien anderer Verkehrsunternehmen gilt, ist unbekannt.

Wichtige Ziele in der Stadt, bspw. die #DemoGegenRechts, können vom Bahnhof aus auch bequem zu Fuß erreicht werden.

#ÖffiUpdate #Saarland #saarpfalz #stingbert #bus #plusbus #expressbus #saarmobil #saarvv #herzstattmerz #fckcdu #fckafd #merzdarfniekanzlerwerden

Hamburg und UmzubotNdrHamburgNews
2024-10-23

Neue Expressbuslinie für den Hamburger Osten ab Dezember

Zum Fahrplanwechsel am 15. Dezember soll es mit der Linie X27 eine neue Verbindung zwischen Bergedorf, Billstedt und Poppenbüttel geben.

ndr.de/nachrichten/hamburg/Neu

Saarland Öffi-Updatessaar@bahn.social
2024-07-09

In #Dillingen findet am Donnerstag der #Firmenlauf statt. Es kommt in der gesamten Innenstadt zu erheblichen Beeinträchtigungen:

Ab 15 Uhr werden die Haltestellen Trierer Str., Saardom, Stadthalle, Dr.-Prior-Str., Karcherstr., Friedrich-Ebert-Str. und Odilienschule nicht mehr angefahren.
Die Linien 444 und 445 werden bis Betriebsschluss eingestellt! Es besteht ein Shuttle-Service nach Pachten.

Ab 17 Uhr umfahren alle übrigen Linien (R5, X5, 401, 403, 410, 411, 424, 466) auch die restlichen Haltestellen in der Innenstadt, einschließlich Primsbrücke und Röderberg bis ca. 20:30 Uhr.

Der Dillinger Bahnhof wird durchgehend von allen Linien angefahren!

#ÖffiUpdate #Saarlouis #KVS #Bus #Plusbus #Expressbus #Umleitung

Saarland Öffi-Updatessaar@bahn.social
2024-04-24

Von heute bis voraussichtlich 17.05.24 fährt die 110 zwischen #Luisenthal und #Saarbrücken eine Umleitung über die Autobahn. Kein Halt in Rockershausen und #Burbach!

Empfehlung:
Völklingen-Rockershausen: 110/RB 70/RB 71 nach Luisenthal, dann weiter mit 108;
Völklingen-Burbach: RE 1/RB 70/RB 71 bis Burbach Mitte;
Saarbrücken-Burbach: RE 1/RB 70/RB 71 bis Burbach Mitte oder Bus 101/102/108/122/129/134;
Saarbrücken-Rockershausen: Bus 102/108

Sowohl #Saarbahn als auch #VVB haben diese Umleitung erst jetzt gemeldet.

#ÖffiUpdate #Saarland #Bus #Expressbus

Malaysia Public Transportmsiapublictransport
2024-04-06

() travelling on a trip of more than 300km are required to have second for safety

The regulation also applies for journeys exceeding four hours to ensure get enough , thereby reducing the risk of accidents

found travelling without a would not be allowed to start their journey

Read more: thestar.com.my/news/nation/202

Various express buses at arrival platforms dropping passengers with other express buses queuing behind the platform. / Photo from linked article.
Malaysia Public Transportmsiapublictransport
2024-03-25

The 10% on during the season is justified by taking into account several aspects including additional service and payment for

The surcharge is not new but has been implemented in the past 20 years during festive season, which includes a week before and a week after the actual festive day

Read more: thesun.my/local_news/loke-clar

Transport Minister, Anthony Loke. / Photo from linked article.
Malaysia Public Transportmsiapublictransport
2024-03-21

There was an accident between () and a trailer lorry (semi-trailer truck) at Kilometre 75.2 (46th Mile) of the North-South Expressway () in early morning of 17 March

The charred body of the dead 42-year-old driver was found trapped in his seat

Five victims including the assistant bus driver, aged 19 to 57 survived

The 32-year-old trailer driver also survived

Read more: malaymail.com/news/malaysia/20

Guar Chempedak Fire and Rescue Station in Gurun. / Photo from linked article.
Malaysia Public Transportmsiapublictransport
2024-03-13

in the economy service category will increase by 10% from 4 - 17 April during celebrations

The Cabinet had approved festive season of RM0.009/km which increases under the category to RM0.102/km compared to RM0.093/km

Temporary Operator Licence application is also opened for extra services in conjunction with Hari Raya to accommodate increase in returning to hometowns

Read more: thestar.com.my/news/nation/202

Multiple express buses parking at a waiting area. / Photo from linked article.
Malaysia Public Transportmsiapublictransport
2024-02-04

A Singapore - could not made it to the Malaysian capital after it caught at about 1.40pm on Friday 2 February

The vehicle was carrying more than 20 people

While travelling near on (), suddenly heard loud static noises on speakers & smelled smoke

The driver stop at stop to check the bus & discovered fire had started in the storage of the

Read more: thestar.com.my/aseanplus/asean

A grid of two photos, left shows small fire in luggage compartment of a bus, right shows huge black smoke after the bus burns down. / Image from linked article.
Malaysia Public Transportmsiapublictransport
2024-02-03

MAN Malaysia has handed over the first with Advanced Driver Assistance Systems () to leading company

The new is part of a total of 10 new MAN comprising five unit and five single deck units, all equipped with ADAS, ordered by Super Nice as it prepares to meet the growing demand for road travel

Read more: carsifu.my/news/man-malaysia-h

A group of people in front of the new double-decker express bus. / Photo from linked article.
Hamburg und UmzubotNdrHamburgNews
2023-12-09

Fahrplanwechsel: Linke kritisiert Bahn-Angebot in Hamburg

Laut einer Analyse fallen in Hamburg-Altona und am Dammtor Züge weg. Dadurch wird es am Hauptbahnhof noch enger, sagt die Linke.

ndr.de/nachrichten/hamburg/Fah

Malaysia Public Transportmsiapublictransport
2023-12-05

The progress of the project has reached 90% and is expected to be completed within a month or so.

The contractor will hand over the terminal to the state government in March next year.

Sentral is an integrated project, which will become a land transport hub in .

Source in Malay: astroawani.com/berita-malaysia

The news is only covered in Malay and Chinese, no English source available. English translation of the source is in 2nd image.

A group of people at Kangar Sentral. / Photo from Suara Merdeka.English translation of the Malay source article, as follow:

Kangar Sentral project progress reached 90 percent

KANGAR: The progress of the Perlis State Integrated Public Transport Terminal or Kangar Sentral project has now reached 90 percent and is expected to be completed within a month or so.

The Perlis Public Works Department (JKR) in a statement on Wednesday informed that the contractor will hand over the terminal to the state government in March next year.

"Kangar Sentral is an integrated public transport center project, which will become a land transport hub in Perlis.

"Among the facilities that will be provided include three departure platforms, arrival platforms (three), temporary bus parking (six), public parking (25 units), taxi parking (25 units), prayer halls, public toilets, commercial spaces such as kiosks and sales stalls as well as the counter," according to the statement.

The information was also presented to Perlis JKR Building Division Senior Civil Engineer Ir Law Jia Haur to Perlis Vice President Tuanku Syed Faizuddin Putra Jamalullail when he agreed to lead a cycling session organized by the Ministry of Public Works (KKR) through the state JKR, yesterday.

The terminal construction project started on 6 Oct 2020 with a cost of approximately RM25 million.

Meanwhile, in conjunction with the cycling program, Tuanku Syed Faizuddin was also pleased to visit three selected asnaf homes with a donation of RM700 in cash and 'MAIPs Peduli Kits' and rice.
Malaysia Public Transportmsiapublictransport
2023-11-30

The structure for the East Coast Rail Link's () services will most likely be unveiled in 2026.

As a regulated industry, prices are subject to approval from the Land Public Transport Agency (), among others.

Ticket prices cannot be so high until many people cannot afford it.

At the same time, it also cannot be too low until it poses a problem for operators.

Read more: thestar.com.my/news/nation/202

Two people at a table. / Photo from linked article.
Malaysia Public Transportmsiapublictransport
2023-09-30

Land Public Transport Agency (APAD) has uploaded the bus terminal licensing guidelines to their website.

The guidelines are only in Malay, and for more information on said guidelines, please visit the link below:
t.ly/BLF93

You can also scan the QR code displayed on the poster below.

(Poster image by APAD Channel)

Poster image in Malay by the Land Public Transport Agency, the background in the poster is an intercity coach express bus moving out from a bus terminal.
Malaysia Public Transportmsiapublictransport
2023-09-06

The purpose of the on-site inspection and monitoring is to ensure that the bus operators always provide sufficient services for the route.

As a result of the findings from the on-field inspection by officers, a discussion session in the afternoon of 5 September 2023 was held at APAD with the Terminal 1 terminal operator and the - Seremban express bus operators.

(Photos by APAD)

Two express bus at a bus terminal.A meeting at a round table.A meeting at a round table.A meeting at a round table.
Malaysia Public Transportmsiapublictransport
2023-09-06

The Express Bus and Terminal Division of the Land Public Transport Agency () has carried out on-field inspection at the Pudu Sentral Terminal on 4 September 2023 to monitor the operation of express (intercity coach) trips on the Pudu—Seremban route during peak hours from 5:00pm to 7:00pm.

Monitoring was also carried out at Terminal 1 Seremban on 5 September 2023 for the operation of express buses during peak hours from 5:00am to 7:30am.

(Photos by APAD)

Bus passengers queuing to board an express bus.Passengers queuing to board an express bus.Passengers buying a ticket from a bus counter.Passengers buying ticket from a bus counter.

Client Info

Server: https://mastodon.social
Version: 2025.04
Repository: https://github.com/cyevgeniy/lmst