#i5

Luigi. . 🇮🇷LuisCrespo
2025-06-18

El BMW serie 5 se vende mejor que la clase E y el A6 en

La rivalidad entre BMW, Mercedes y Audi en el segmento de lujo continúa, con la serie 5 de BMW liderando las ventas en Europa en 2024.

De enero a abril de 2024, BMW vendió 20.402 modelos de la serie 5, un 56% más que en el mismo período del año pasado, incluidos 8.843 modelos eléctricos del según .

🌈 ☯️Teresita🐧👭linuxgal@techhub.social
2025-06-13

Canoe Pass Bridge, Deception Pass State Park #Washington #I5

2025-04-30

Ready to catch the sunset.
BMW Individual Frozen Deep Grey metallic. The BMW i5 M60 xDrive

#BMW #i5 #M60 #xDrive

토픽트리topictree
2025-02-25

BMW 신형 "이제야 제대로 나왔다"... 파격적인 변화에 반응 폭발

topictree.co.kr/?p=24944

TuxStoryTuxstory
2025-01-30

Testing AlmaLinux on a Lenovo MIIX 520 to see if the touch screen is working.
And it works perfectly fine.
AlmaLinux Live 9.4 KDE.

Mac4Evermac4ever
2025-01-18

La Pologne ou la Panne ? Road-trip en voiture électrique avec la BMW i5 (et gastronomie)
mac4ever.com/186458

2024-12-21

The next #thinkpad on my #workbench is an #E450 – I grabbed this from #ewaste to provide a family member a better laptop. It has a #i5-5200U at 2.2Ghz, and a max 16GB of #DDR3L #RAM so it can/should run #Win11, #linux, or #BSD with ease. The IO is ok, with multiple #USB3 ports, #HDMI, #ethernet and a memory card reader. This is a decent form factor, weight, and would make a decent laptop for someone. Though no docking station capabilities, they removed the port underneath.

There is a big BUT with this laptop though: it keeps freezing, and the video is glitching. Which may be why it went to ewaste…

I upgraded the DDR3L RAM to 16GB, and wiped the 500GB SSD that came with it.
Starting installing #Win11, and I let it install and reboot so I could refill my tea – to come back and the laptop was frozen with a black screen.
I rebooted, and it froze on the initial Win11 change password screen.
I rebooted again, went into the #Lenovo #BIOS #diagnostic tool, and started the full tests. As the test were running, I touched the nub and the video started glitching. Letting the test continue, the laptop froze while testing.

So, is this beyond time & effort to get working – or pull the spare parts and move on from?

(images attached)

#siliconValley #SillyValley #sanfrancisco #sanfran #sanfranciscocomputers #sanfrancomputers #sanfranciscovintagecomputers #sanfranvintagecomputers #sanfranciscovintagehardware #sanfranvintagehardware
#vintagecomputing #vintagecomputint #vintagecomputer #vintagecomputers #vintagecomputalk
#vintagehardware #computerHistory #retro #VCF #vintageComputerFestival
#retrocomputing #retroComputers #WallOfRetro #retroTech #retroTechnology
#nerdsOfVintage #happyNerding
#computer #tech #computerHardware #laptop #laptops
#IBM #thinkpad #thinkpads #VintageThinkPad #X86 #WindowsVista #IBMhardware #lenovoHardware #Thinkpadnium
#upcycle #restore #TechnologyRepair #ThinkPadRepair #WasteNotWantNot
#makeShitMonday #showmewhatyougot

Glitchy LCD on an E450 Thinkpad, during the initial password creation processFrozen E450 with glitchy screen during Lenovo diagnostic test processGlitchy LCD on E450 during Windows 11 install boot verification process
Peter West Careypwc@mastodon.online
2024-11-24

Bridge Over The 5

Description: Remember, in Southern California all the highways and freeways are "the". I think I'm finally getting the hang of it.

Speaking of hanging, here's an aerial photo hanging out over The 5 and Humboldt.

Location: Los Angeles, Cal

thecareyadventures.com/blog/br

#AerialFootage #California #NorthAmerica #PhotoOfTheDay #USA #aerial #b7w #BlackAndWhite #California #freeay #I5 #Interstate5 #PhotoOfTheDay #traffic #travel #USA

全新純電 BMW i5 M60 Touring 登場 5 系旅行車首次採用全電動驅動系統
在 SUV 大行其道的時候,旅行車仍然有一定的捧場客,其中 BMW 就在香港正式推出全新的純電 BMW i5 M60 xDrive Touring 純電旅行車,是 5 系旅行車首次採用全電動推動系統。
The post 全新純電 BMW i5 M60 Touring 登場 5 系旅行車首次採用全電動驅動系統 appeared first on 香港 unwire.hk 玩生活.樂科技.
#汽車科技 #bmw #BMW i5 Touring #i5
unwire.hk/2024/10/10/bmw-i5-m6

2024-08-28

One from Weed.

#travel #photography #I5

An abstractish view of old art deco movie theater in blue and white.
2024-08-14

Trail connection to planned Roanoke Lid would restore a historic Seattle bike path + Tell WSDOT not to cut it

Not only would the Harvard Ave path connect the Roanoke Lid and 520 Trail along a safer and less steep route, it would also restore a small piece of Seattle’s first ever bike paths.

You can support a Central Seattle Greenways effort to protect the proposed path from budget cuts on the freeway megaproject.

The 1895 Lake Union Bike Path cannot be accurately restored because, well, it’s now the path of I-5 between downtown and SR-520. But photos from the turn of the 20th century show the crossroads where the Lake Union path connected to the 1896 Lake Washington Bike Path that lead folks east through the forest now known as Interlaken Park. That old crossroads would most likely be located somewhere within the I-5/520 interchange on land that was excavated for freeway construction, and the Lake Washington path hugged the hillside as it curved to the east. The closest existing land to this historic path would be the proposed Harvard Connection path that has been planned as part of the Roanoke Lid of the SR-520 replacement project.

Base map with grades from Central Seattle Greenways, historic photo and approximate location added by Seattle Bike Blog. The exact spot where the photo was taken has since been excavated for freeway construction.

Like the old path, the Harvard Connection would hug the hillside to follow the least-steep route as it turns east toward the lid and Interlaken Blvd. The only surviving engineering plot of the old Lake Washington path (that I was able to find, anyway) ends on top of the proposed Roanoke Lid on the northeast corner of what is now 10th Ave E and E Roanoke Street, and the early design for the lid already includes a path that follows a similar path. The proposed Harvard Connection would meet up nicely with the historic route, creating opportunities for heritage markers or public art connecting the past to the present. With the freeway interchange roaring in the background, it could be an opportunity for folks to reflect on the marks we leave on this land, how an innocent-looking bike path through the forest was a harbinger of white colonial land theft and settlement that in just a few short decades grew into a freeway.

Here’s the text of the action alert you can sign from Central Seattle Greenways:

The Washington State Department of Transportation (WSDOT) is planning to delete a key bike and pedestrian connection from the future Roanoke Lid over SR 520 between Capitol Hill and Eastlake. Tell WSDOT that removing this community-supported connection to the SR 520 Trail is unacceptable.

The Harvard Connection, the dashed yellow path pictured in the image above, would offer a vital lower-incline and safer connection towards Capitol Hill for users of all ages and abilities via a tunnel under 10th Ave E and a gently sloping path from the Roanoke Lid up to E Miller St.

Cutting the Harvard Connection would only save about 1% ($10-15 million) of the car-centric megaproject’s $1.4 billion budget. WSDOT has justified their shortsighted decision by asserting that the path wouldn’t provide a meaningful connection. This is not accurate: it would provide a valuable alternative for southbound trips from the Roanoke Lid with gentler (6%) grades and lower traffic stress than navigating the busy intersection of 10th Ave E and E Roanoke St and the block south of it, which has a 10% slope.

With the future Roanoke Lid likely to become a community destination for events and other activities, the Harvard Connection would offer accessibility not only for bicyclists but also pedestrians using wheelchairs and other mobility devices. Removing it would leave parkgoers without an alternative to the prohibitively steep slopes on 10th Ave E, Federal Ave E, and 11th Ave E

TELL STATE AND CITY TRANSPORTATION OFFICIALS AND ELECTED LEADERS: Please restore the Harvard Connection and keep your promise to people bicycling, rolling, and walking on the future Roanoke Lid over SR 520.

Share

#SEAbikes #Seattle

Base map of the project area near Roanoke Park with bike route grades noted. A historic photo and its approximate location is also included with note: The exact spot where the photo was taken has since been excavated for freeway construction.Old black and white photo of a fork in a bike path with a sign pointing right that reads To Lake Washington 5.5 miles.Map of the Roanoke Lid area of the 520 project with grades of possible bike routes listed. All include a 10% climb except the path. The historic photo is added in an approximate location nearby.
🧿🪬🍄🌈🎮💻🚲🥓🎃💀🏴🛻🇺🇸schizanon
2024-07-27

I have a lying around and I decided to install on it, so I am obligated to tell you about it.

It's an 11th gen quad core Core with 16GB of RAM, and an Intel , so it should be good enough for most .

First I put on it, but that's a little barebones and I couldn't find the low level settings, so I just installed and instead. Hopefully I can find a frontend like

2024-07-15

Seattle activist who protested on I-5 are facing serious legal risks which they now need community support to continue fighting in court.

Let's show up for these activist in their time of need!

gofundme.com/f/pro-palestine-l

#Seattle #FreePalestine #ACAB #I5

2024-06-25

It's ALSO worth mentioning that, at the exact time that Loud n Lit is starting on Friday night, I-5 is closing between exits 294 - 297 for three whole days. All of this is to say that, maybe this weekend is a good time to ride your bike or stay home! #portland #traffic #carbrain #i5

This seems way too coincidental. Is a USDOT "Reconnecting Communities" grant going to plug the budget hole in the I-5 Rose Quarter widening in Portland? It's being advertised as a lid.

#portland #i5 #LidI5 #rosequarter

blumenauer.house.gov/media-cen

Leszek Ciesielskiskolima@hachyderm.io
2024-02-08

@nico Recent example: updated #Porsche #Taycan can recuperate at up to 400 kW (source: edmunds.com/car-news/2025-pors ) while supporting charging at up to 290 kW.

New #BMW #i5 M60 (using older 400 V architecture) can charge at up to 205 kW and recuperate at up to 198 kW.

So those two values are closely related but not the same either :-)

BMW i5 tech data: New BMW i5 M60 (using older 400 V architecture) can charge at up to 205 kW and recuperate at up to 198 kW.
2024-01-11

"Salem has budgeted $17 million for pedestrian improvements from the 2022 Safety and Livability Bond." #Salem flashalert.net/id/CityofSalem/

It'd be amazing to win that amount of money in the lotto, yet it seems like hardly anything when compared to $8 billion dollars of new #I5 #freeway lanes in nearby #Portland.

#Silly & #expensive to spend billions to build lanes for more cars, then spend millions to try to compensate for the danger posed by those additional cars.

2024-01-09

I sat down and edited some video from this past weekend.

📸 @nullagent

✈️ @sameervd@twitter.com

🎶 @BlackB17@youtube.com

#Seattle #FreePalestine #CeasefireNow #PattyMurray #JoeBiden #Protest #PNW #I5 #Music

Client Info

Server: https://mastodon.social
Version: 2025.04
Repository: https://github.com/cyevgeniy/lmst